The children bring in their own plastic chair to school each day or use a piece of wood supported by two blocks of cement. Benches are used as tables. The books are few and materials almost non existent.
At present one hundred and fifteen children are enrolled but the teachers estimate that more will enroll once the school is built.
The total cost of the school is an estimated $ 38,663, we are rounding it up to 38,500. The Municipality will contribute an approximate $ 13,000, the villagers approximately $ 5,500 and the Seekerīs Church has raised $ 10,000. We need to raise an additional $10,000 in order to complete the 3 classroom extension to the school. We are asking De la Selva to raise these $10,000.
We have worked the budget considering Seeker’s Church and De la Selva together, and the divided by two.

The
above photograph was taken at La Puerta; this school was built last
year.
The school we are planning to build in
Paxixl would look like this.
Below is the
detailed budget and what each participant would contribute.
|
Budget |
|
|
|
|
P:A:V.A.( Seeker’s Church and De La Selva |
Quantity |
Cost per unit |
Total |
|
Block |
2900 |
2,95 |
8.555,00 |
|
Cement |
315 |
63,84 |
20.109,60 |
|
Iron |
47 |
347,00 |
16.309,00 |
|
Wire |
2 |
490,00 |
980,00 |
|
Roof sheets |
109 |
96,50 |
10.518,50 |
|
Other roof materials |
70 |
8,80 |
616,00 |
|
Lime |
190 |
23,85 |
4.531,50 |
|
Imitation Granite floor |
207 |
66,00 |
13.662,00 |
|
w.c. |
4 |
74,80 |
299,20 |
|
Tubes |
18 |
50,55 |
909,90 |
|
Nails, total of lb. |
95 |
7,00 |
665,00 |
|
Wood protector by teh galon |
6 |
195,00 |
1.170,00 |
|
Total of doors, windows, and mobile walls |
|
30.000,00 |
|
Stove |
1 |
1.300,00 |
1.300,00 |
|
Wash basins , everything included |
8 |
131,20 |
1.049,60 |
|
Water deposit |
1 |
1.055,00 |
1.055,00 |
|
Wash basin |
1 |
240,00 |
240,00 |
|
Drainage system |
1 |
107,50 |
107,50 |
|
4 traction vehicle, gas and maintenance |
4 |
1.500,00 |
6.000,00 |
|
Motorcycle, gas and maintenance |
4 |
500,00 |
2.000,00 |
|
Water and other basic supplies
for workers |
1 |
1.000,00 |
1.000,00 |
|
Cement and stone mixing machine |
1 |
700,00 |
700,00 |
|
Tecnitian salary , 4 months |
4 |
4.480,00 |
17.920,00 |
|
Administrative costs |
4 |
2.000,00 |
8.000,00 |
|
Sub total |
|
|
147.697,80 |
|
10 % inflation and unpredictables |
|
|
14.769,78 |
|
Total |
|
|
162.467,58 |
|
|
|
|
|
|
Community |
|
|
|
|
Wood beams, different measures |
455 |
22,00 |
10.010,00 |
|
1. Food for skilled
hand, 4 months |
90 |
225,00 |
12.150,00 |
|
2. Unskilled labor from community |
90 |
225,00 |
20.250,00 |
|
Plaque |
1 |
1.000,00 |
1.000,00 |
|
Total |
|
|
43.410,00 |
|
1. 5 people a day
earn Q 45 |
|
|
|
|
2. 5 people 3 meals
a day for 45 |
|
|
|
|
This is given by the community but if we had to pay it that is
what it would cost. |
|
|
|
|
|
|
Municipality |
|
|
|
|
Small stone, by cubic meters |
40 |
215,00 |
8.600,00 |
|
River sand, by cubic meter |
40 |
105,00 |
4.200,00 |
|
White sandby cubic meter |
12 |
75,00 |
900,00 |
|
Yellow sand by cubic meter |
12 |
75,00 |
900,00 |
|
Select material by cubic meter |
8 |
70,00 |
560,00 |
|
Water paint by the gallon |
15 |
80,00 |
1.200,00 |
|
Oil paint by the gallon |
1 |
70,00 |
70,00 |
|
Transportation of materials by trip |
7 |
2.000,00 |
14.000,00 |
|
Electric supplies, total |
|
8.000,00 |
8.000,00 |
|
Equipment for classrooms, desks, chairs, etc. |
10.000,00 |
10.000,00 |
|
Qualified labor , monthly |
4 |
13.750,00 |
55.000,00 |
|
Total |
|
|
103.430,00 |
|
|
|
|
|
|
Total per group |
|
|
|
|
Seekerīs Church |
Q81.233,79 |
$ 10.154,22 |
|
|
De la Selva |
Q81.233,79 |
$ 10.154,22 |
|
|
Community |
Q43.410,00 |
$ 5.426,25 |
|
|
Municipality |
Q103.430,00 |
$ 12.928,75 |
|
|
|
Q309.307,58 |
$ 38.663,45 |
|
|
|
|
|
|
|
|
|
|
|
P.A.V.A.īs philosophy requires that the community
and Municipality participate in the projects; this enables the community
members to acquire ownership of the project thus guaranteeing its
subsequent viability. The community has promised to contribute with
materials and unskilled labor.
The Municipality will contribute with
materials, transportation and qualified labor.
The Seekerīs Church group will come in the month
of June and begin the construction work, they will work for 2 weeks.
After that the PAVA technician will oversee and direct the job to full
completion.
|