School at Paxixil

The rural village of PAXIXIL is located 5 km. from Tecpan, Chimaltenango. Most of the people are mainly farmers and are extremely poor. In July of this year, a group from the Seekerīs Church will come to build an extension to the school. They have raised $10,000 but we need an additional $10,000 to be able to complete the construction project. "

 

School at Paxixil 

As you can see in the above photo, the children receive classes  in this shack.

It is dark, with a dirt floor, and badly equipped.

 

School at Paxixil 

 

The children bring in their own plastic chair to school each day or use a piece of wood supported by two blocks of cement. Benches are used as tables. The books are few and materials almost non existent. At present one hundred and fifteen children are enrolled but the teachers estimate that more will enroll once the school is built. The total cost of the school is an estimated $ 38,663, we are rounding it up to 38,500. The Municipality will contribute an approximate $ 13,000, the villagers approximately $ 5,500 and the Seekerīs Church has raised $ 10,000. We need to raise an additional $10,000 in order to complete the 3 classroom extension to the school. We are asking De la Selva to raise these $10,000. We have worked the budget considering Seeker’s Church and De la Selva together, and the divided by two.

The above photograph was taken at La Puerta; this school was built last year.  The school we are planning to build in Paxixl would look like this.

Below is the detailed budget and what each participant would contribute.

 

Budget

 

 

 

P:A:V.A.( Seeker’s Church and De La Selva

Quantity

Cost per unit

Total

Block

2900

2,95

8.555,00

Cement

315

63,84

20.109,60

Iron

47

347,00

16.309,00

Wire

2

490,00

980,00

Roof sheets

109

96,50

10.518,50

Other roof materials

70

8,80

616,00

Lime

190

23,85

4.531,50

Imitation Granite floor

207

66,00

13.662,00

w.c.

4

74,80

299,20

Tubes

18

50,55

909,90

Nails, total of lb.

95

7,00

665,00

Wood protector by teh galon

6

195,00

1.170,00

Total of doors, windows, and mobile walls

 

30.000,00

Stove

1

1.300,00

1.300,00

Wash basins , everything included

8

131,20

1.049,60

Water deposit

1

1.055,00

1.055,00

Wash basin

1

240,00

240,00

Drainage system

1

107,50

107,50

4 traction vehicle, gas and maintenance

4

1.500,00

6.000,00

Motorcycle, gas and maintenance

4

500,00

2.000,00

Water and other basic supplies  for workers

1

1.000,00

1.000,00

Cement and stone mixing machine

1

700,00

700,00

Tecnitian salary , 4 months

4

4.480,00

17.920,00

Administrative costs

4

2.000,00

8.000,00

Sub total

 

 

147.697,80

10 % inflation and unpredictables

 

 

14.769,78

Total

 

 

162.467,58

 

 

 

 

Community

 

 

 

Wood beams, different measures

455

22,00

10.010,00

1. Food  for skilled hand, 4 months

90

225,00

12.150,00

2. Unskilled labor from community

90

225,00

20.250,00

Plaque

1

1.000,00

1.000,00

Total

 

 

43.410,00

1.  5 people a day earn Q 45

 

 

 

2.  5 people 3 meals a day for 45

 

 

 

This is given by the community but if we had to pay it that is what it would cost.

 

 

 

 

Municipality

 

 

 

Small stone, by cubic meters

40

215,00

8.600,00

River sand, by cubic meter

40

105,00

4.200,00

White sandby cubic meter

12

75,00

900,00

Yellow sand by cubic meter

12

75,00

900,00

Select material by cubic meter

8

70,00

560,00

Water paint by the gallon

15

80,00

1.200,00

Oil paint by the gallon

1

70,00

70,00

Transportation of materials by trip

7

2.000,00

14.000,00

Electric supplies, total

 

8.000,00

8.000,00

Equipment for classrooms, desks, chairs, etc.

10.000,00

10.000,00

Qualified labor , monthly

4

13.750,00

55.000,00

Total

 

 

103.430,00

 

 

 

 

Total per group

 

 

 

Seekerīs Church

Q81.233,79

$ 10.154,22

 

De la Selva

Q81.233,79

$ 10.154,22

 

Community

Q43.410,00

$ 5.426,25

 

Municipality

Q103.430,00

$ 12.928,75

 

 

Q309.307,58

$ 38.663,45

 

 

 

 

 

 

 

 

 

 

 

P.A.V.A.īs philosophy requires that the community and Municipality participate in the projects; this enables the community members to acquire ownership of the project thus guaranteeing its subsequent viability. The community has promised to contribute with materials and unskilled labor.  The Municipality will contribute with materials, transportation and qualified labor.

The Seekerīs Church group will come in the month of June and begin the construction work, they will work for 2 weeks. After that the PAVA technician will oversee and direct the job to full completion. 

 